Home /

YOUR PROJECT. YOUR PAPERWORK.

What documents
do I need?

A clearer starting point for your application. Choose your state and proposed work to see the forms, plans and supporting information to prepare.

  1. Illustrative cutaway building model on architectural plans.
    01Choose your project

    Select the state and proposed work.

  2. Illustrative assessment of building sections and supporting evidence.
    02Review your checklist

    See the relevant forms and information.

  3. Illustrative application folio with plans and supporting forms.
    03Prepare your pack

    Print your checklist and follow your state guide.

Just need a form? Download contracts, applications & checklists

APPLICATION DOCUMENT FINDER

Your application checklist

Start with your state and proposed work. Your checklist updates as you select the approval pathway and building arrangements.

Not sure yet? Select that option and we’ll show you a practical starting point for a conversation with our team.

This guide helps you prepare. iPermit confirms the documents needed for your site, building class and scope. It does not determine approval eligibility or permission to start work.

Discuss your application

A checklist that fits the work.

A pool application needs different drawings from a home extension or commercial project. Choose your state above to begin.

NSW

NEW SOUTH WALES

NSW application process

The contract, supporting documents, Planning Portal and separate principal certifier appointment, explained in order.

Read the NSW application guide
VIC

VICTORIA

Victorian application process

The owner’s appointment, correct Form 1, application pack and assessment, through to inspections and completion.

Read the Victorian application guide

THE KEY DIFFERENCES

Two states.
Two application processes.

Use this overview to orient yourself, then follow the detailed guide for your state.

Compare the usual NSW and Victorian application stages
StageNew South WalesVictoria
Begin the engagementComplete the certification contract and have all owners sign.Arrange the owner’s building surveyor appointment.
Prepare the applicationCC or CDC documents, the signed contract and supporting plans.Appropriate Form 1, appointment form and supporting documents.
Where to submitNSW Planning Portal; also submit the separate principal certifier appointment application.Send the application pack to admin@ipermitba.com.au.
Before constructionConfirm certificate issue, accepted PC appointment and all relevant pre-start requirements.Confirm permit issue, approved documents, conditions and inspection stages.
At completionRequired inspections and evidence; Occupation Certificate application where required.Required inspections and evidence; Occupancy Permit or Certificate of Final Inspection as stated on the permit.

A preparation overview, not an eligibility assessment. Requirements depend on the property, project and existing approvals.

A FEW USEFUL DETAILS

Application questions

What if I do not have plans yet?

You can still start a conversation. Share the property address, proposed work, estimated cost and any available drawings or approvals. Tell us what is still being prepared so we can explain the next steps.

Does this show every document my project will need?

It is a preparation guide tailored to your selections. Site conditions, building class, design details and existing approvals can change what is needed. iPermit confirms the project-specific requirements and may request further information during assessment.

Do I need every document in Resources?

No. Resources includes application forms, completion certificates and specialist reference material. Start with the links in your checklist and confirm the applicable items with us. Existing reference documents may use earlier terminology or thresholds; our team confirms current requirements.

How should I organise my attachments?

Use clear filenames and drawing revision dates, provide the latest coordinated plans and explain any changes. Upload NSW application documents to the Planning Portal. For Victoria, use the property address and any project reference in your email subject. Ask us how to share large files.

I need an inspection, not a new application.

Have the property address, permit or project reference, inspection stage, site contact and access details ready. For an existing pool barrier, include the council letter or previous inspection record. Contact us to confirm inspection arrangements.

What about an amendment or existing appointment?

Contact us before making a new application. Tell us about existing approvals, work already started and any certifier or surveyor already appointed. Amendments, extensions and changes of appointment need a project-specific discussion.

About this checklist and official guidance

Prepared from iPermit’s application documents and official guidance checked 17 October 2026. The document finder does not assess legal compliance or determine an approval pathway. Requirements and forms can change; confirm the current requirements with our team.

Apply to iPermit using the process in your selected checklist. The council guidance above is a supporting reference, not an instruction to appoint the council as your building surveyor.

CURRENT CLIENT GUIDANCE

Check the requirements
before you apply.

Understand the NCC edition for your project, Victorian Form 26 and the separate NSW principal certifier appointment.

Read the 2026–27 building approval updates

Website guidance checked 15 October 2026.

Illustrative models and scenes; not iPermit project photographs or construction details.